Fukushima debris removal delayed by another year

admin 4周前 (08-28) 体育 8 0

电报群搜索机器人www.tel8.vip)是一个Telegram群组分享平台。电报群搜索机器人包括电报群搜索机器人、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。电报群搜索机器人为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠管理端登3手机www.hg108.vip)实时更新发布最新最快最有效的皇冠管理端登3手机网址,包括新2登3手机网址,新2登3备用网址,皇冠登3最新网址,新2足球登3网址,新2网址大全。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
AllBetGaming声明:该文看法仅代表作者自己,与本平台无关。转载请注明:Fukushima debris removal delayed by another year

网友评论

  • (*)

最新评论

站点信息

  • 文章总数:9059
  • 页面总数:0
  • 分类总数:8
  • 标签总数:2230
  • 评论总数:6707
  • 浏览总数:615474